NNPC and Seplat – Tech | Business | Economy https://techeconomy.ng Tech | Business | Economy Fri, 13 Feb 2026 14:31:33 +0000 en-GB hourly 1 https://wordpress.org/?v=7.0 https://techeconomy.ng/wp-content/uploads/2025/06/cropped-256Px-32x32.png NNPC and Seplat – Tech | Business | Economy https://techeconomy.ng 32 32 NNPPC Alert: Seplat’s 4-Day Gas Maintenance to Affect GenCos https://techeconomy.ng/nnppc-alert-seplats-4-day-gas-maintenance-to-affect-gencos/ https://techeconomy.ng/nnppc-alert-seplats-4-day-gas-maintenance-to-affect-gencos/#respond Fri, 13 Feb 2026 14:31:33 +0000 https://techeconomy.ng/?p=176108 Nigeria’s power sector is bracing for a potential dip in generation capacity following the commencement of a scheduled four-day maintenance exercise by Seplat Energy Plc.

The Nigerian National Petroleum Company (NNPC) Limited issued a regulatory update on Thursday, February 12, 2026, confirming that the maintenance, which runs from February 12 to February 15, will lead to a temporary reduction in gas volumes available to the NNPC Gas Infrastructure Company (NGIC) pipeline network.

The Impact on the Power Value Chain

Seplat Energy is a critical upstream supplier to the NGIC, which feeds several of Nigeria’s primary thermal power plants.

The Squeeze on GenCos: With a “temporary drop” in gas supply, several GenCos are expected to experience reduced feedstock availability. This directly translates to lower electricity output on the national grid during the 96-hour window.

Standard Protocols: NNPC spokesperson Andy Odeh emphasized that the maintenance is not an emergency but a “standard industry safety and asset integrity protocol” aimed at ensuring the long-term reliability of the infrastructure.

Mitigation: The Search for Alternative Supply

To prevent a total system collapse or severe load shedding, NNPC Gas Marketing Limited (NGML) has activated its contingency framework.

Alternative Sourcing: The company is currently “engaging alternative gas suppliers” to bridge the shortfall. This strategy is critical to maintaining the minimum threshold of stability required across the domestic gas-to-power network.

The Recovery Timeline: Full supply is expected to resume by Monday, February 16, 2026.

Industry analysts suggest that the speed of recovery will depend on how quickly the NGIC pipelines can be re-pressurized once Seplat’s maintenance is completed.

]]>
https://techeconomy.ng/nnppc-alert-seplats-4-day-gas-maintenance-to-affect-gencos/feed/ 0